Dedicated investment by Kellogg's Company with a total area of about 13,000 sq m. & nbsp;
The new facility is located in the vicinity of the functioning building assuming the inclusion of both facility & the complex manufacturing and distribution logistics process.
The investment was carried out by Panattoni Poland. P>
DC1 | |
---|---|
Total area sqm | 13 000 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | b.d. |
Floor loading: | b.d. |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC2 | |
---|---|
Total area sqm | 27 237 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | b.d. |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |