The Pomeranian Logistics Center is a modern investment that is able to provide tenants with around 500,000 sq m. space for rent.
Warehouses are designed for storage as well as light production, equipped with the highest standard of security (sprinklers, smoke dampers, 24 / h protection).
Warehouses and office space can be adapted to the individual needs of the Tenant & oacute; wz for various industries.
Minimum warehouse modules for rent are available from about 3 & nbsp; 400 sq m.
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
Warehouse area | Min module | Check availability |
---|---|---|
62 500 m2 | 3 400 m2 | CHECK |
42 000 m2 | 3 400 m2 | CHECK |
31 500 m2 | 3 400 m2 | CHECK |
31 500 m2 | 3 400 m2 | CHECK |
29 800 m2 | 3 400 m2 | CHECK |
28 050 m2 | 3 400 m2 | CHECK |
28 050 m2 | 3 400 m2 | CHECK |
28 000 m2 | 3 400 m2 | CHECK |
21 100 m2 | 3 400 m2 | CHECK |
14 400 m2 | 3 400 m2 | CHECK |
Budynek 14A | |
---|---|
Total area sqm | 28 050 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Budynek 14B | |
---|---|
Total area sqm | 28 050 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | b.d. |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC1 | |
---|---|
Total area sqm | 51 748 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC10 | |
---|---|
Total area sqm | 62 500 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC11 | |
---|---|
Total area sqm | 14 400 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC12 | |
---|---|
Total area sqm | 21 100 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC13 | |
---|---|
Total area sqm | 42 000 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC2 | |
---|---|
Total area sqm | 36 757 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | b.d. |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC3 | |
---|---|
Total area sqm | 36 757 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC4 | |
---|---|
Total area sqm | 24 560 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC5 | |
---|---|
Total area sqm | 38 920 m2 |
Status: | Existing |
Stacking height: | 12.00 m |
Column grid: | 12x24 |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC6 | |
---|---|
Total area sqm | 29 800 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC7 | |
---|---|
Total area sqm | 31 500 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC8 | |
---|---|
Total area sqm | 28 000 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC9 | |
---|---|
Total area sqm | 31 500 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
News
Sieć hipermarketów budownlanych-Leroy Merlin wynajęła powierzchnię magazynową, około 3 400 mkw. w Pomorskim Centrum Logistycznym.
Ta lokalizacja zapewni firmie sprawny i szybki transport towarów do sklepu, który znajduje się przy ul. Grunwaldzkiej oraz efektywne wsparcie dla firm z sektora FMCG, e-commerce czy detalicznego.
Firma DSV Solutions, która jest operatorem zaawansowanych rozwiązań logistyki kontenerowej, wynajęła 9 000 mkw. powierzchni magazynowej w Pomorskim Centrum Logistycznym.
Jednym z czynników przemawiającym za wyborem obiektu należącego do dewelopera Goodman jest bardzo dobra lokalizacja. Inwestycja położona jest bezpośrednio przy terminalu kontenerowym DCT i w sąsiedztwie autostrady A1 oraz drogi ekspresowej S6.
Wynajęta powierzchnia została dostosowana do potrzeb Najemcy.