Panattoni Park Goleniów is another investment by developer Panattoni in the West Pomeranian region. The complex is located in the Goleniów Industrial Park and offers about 65,000 sqm of modern warehouse space within three buildings.
Each of the buildings comprising the park will undergo BREEAM certification at the Very Good level. The certification attests to the complex's compliance with relevant environmental requirements. Pro-environmental and energy-saving solutions applied by the developer result in lower energy and water consumption costs and increase tenant satisfaction.
Modules for lease at Panattoni Park Goleniów start from as low as 1,200 sqm and offer the highest technical standard:
The external area of the complex has numerous parking spaces and maneuvering areas for delivery vehicles.
The strategic location of Szczecin on the map of Europe, right on the Polish-German border, with access to a seaport and road infrastructure of pan-European scope, has made the region an important logistics center not only for Polish companies, but also for its western neighbors.
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
Budynek 2A | |
---|---|
Total area sqm | 14 700 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 22,5x12 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Budynek 2B | |
---|---|
Total area sqm | 31 173 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 22,5x12 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC1 | |
---|---|
Total area sqm | 8 388 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 22,5x12 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |