Basic informations
| Existing | 101 961.00 m2 |
| Under development | 0.00 m2 |
| Planned | 0.00 m2 |
| Rent price | ASK |
Free area
| Up to 1 month | 11 818.00 m2 |
| Up to 3 months | 11 818.00 m2 |
| Over 3 months | 11 818.00 m2 |
| Min module | 2 700.00 m2 |
| Minimum rental period | 3 years |
Park Szczecin is a logistics center consisting of four buildings with a total warehouse area of over 98,000 sqm. The facility is prepared to serve as a logistics and distribution center or a light manufacturing plant.
The warehouse park was built in 2007 by the developer Prologis, popular on the Polish market. In 2018, it was purchased by the Asian fund Mapletree, which was entering Poland, and has remained its property since then.
The warehouse spaces available within the park have enjoyed constant interest from tenants for years, among whom we can find many well-known companies on the market. The available warehouses are A-class spaces with the following parameters:
The available office spaces have been prepared to an equally high standard, providing:
The Park Szczecin logistics center is located in the West Pomeranian Voivodeship within the Goleniów Industrial Park.
Thanks to its location in the immediate vicinity of the S3 expressway, it is possible to quickly depart both northwards towards the port in Świnoujście (distance of 70km) or southwards to the A6 motorway (40km to the German border). The southern route also allows access to national road number 10 leading to Stargard and Bydgoszcz.
The warehouse park is located 7km from the airport in Goleniów, which can be reached via the S3 road and then turning onto national road number 6.
In the morning, afternoon, and evening hours, free public transport runs on the route Goleniów - Goleniów Industrial Park - Goleniów. The bus departs from the PKP railway station in Goleniów, and the subsequent stops are the most important industrial facilities within the industrial zone.
Distance:
Check distance
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| Total area sqm | Status: | Stacking height: | Column grid: | Floor loading: | Sprinklers | |
|---|---|---|---|---|---|---|
| DC1 | 41 845 m2 | Existing | 10.00 m | 12x25m | 5 000 kg/m2 | |
| DC2 | 13 845 m2 | Existing | 10.00 m | 12x25m | 5 000 kg/m2 | |
| DC3A | 27 799 m2 | Existing | 10.00 m | 12x25m | 5 000 kg/m2 | |
| DC3B | 18 472 m2 | Existing | 10.00 m | 12x25m | 5 000 kg/m2 |