The 7R Park Gdańsk IV logistics center is a modern warehouse and logistics facility with an area of over 42,000 sqm.
A-class warehouse space with an increased storage height of up to 11.7m, floor load capacity of up to 7,000 kg / sqm, and fire load density of up to 4000 MJ / sqm allows for efficient storage and full utilization of the warehouse space. Additionally, the dock area, illuminated with natural light up to 8%, facilitates loading and unloading operations.
In addition to the warehouse space, high-quality office and staff facilities are available, adapted in layout and size to the needs of tenants.
The facility uses numerous ecological solutions such as photovoltaic panels and DALI lighting control. Confirmation of the high quality and applied ecological solutions is the facility's BREEAM Excellent certification.
Among others, a manufacturer of medical materials will conduct its operations in the 7R Park Gdańsk IV warehouses. Warehouse modules from approx. 4,000 sqm are still available. The planned completion of the center's construction is the second quarter of 2025.
Check distance
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| Total area sqm | Status: | Stacking height: | Column grid: | Floor loading: | Sprinklers | |
|---|---|---|---|---|---|---|
| DC1 | 41 338 m2 | Existing | 12.00 m | 22,6x12 | 7 000 kg/m2 |