Basic informations
| Existing | 90 956.00 m2 |
| Under development | 0.00 m2 |
| Planned | 0.00 m2 |
| Rent price | ASK |
Free area
| Up to 1 month | 20 898.00 m2 |
| Up to 3 months | 20 898.00 m2 |
| Over 3 months | 20 898.00 m2 |
| Min module | b.d. |
| Minimum rental period | 3 years |
Exeter Park Gdańsk -Airport is a logistics center which will ultimately offer approximately 100,000 sq m within four warehouse halls. warehouse and office space for rent.
The facility meets the conditions for light production.
The height of the storage halls is 10 m.
A dust-free floor, capacity 5T / sqm
Exeter Park Gdańsk-Airport responds to tenants for the needs of logistics, distribution, storage, light production & nbsp; and cold storage.
The warehouse modules meet the expectations of the most demanding tenants. P>
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| Warehouse area | Min module | Check availability |
|---|---|---|
| 12 543 m2 | ASK | CHECK |
| 5 940 m2 | 5 940 m2 | CHECK |
| 4 188 m2 | 4 188 m2 | CHECK |
| 4 167 m2 | ASK | CHECK |
| DC1 | |
|---|---|
| Total area sqm | 36 186 m2 |
| Status: | Existing |
| Stacking height: | 10.00 m |
| Column grid: | b.d. |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |
| DC2 | |
|---|---|
| Total area sqm | 35 069 m2 |
| Status: | Existing |
| Stacking height: | 10.00 m |
| Column grid: | b.d. |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |
| DC3 | |
|---|---|
| Total area sqm | 19 701 m2 |
| Status: | Existing |
| Stacking height: | 10.00 m |
| Column grid: | 12x24 |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |