The logistics center located at Druckiego street is the first warehouse project of the well-known developer J.W. Construction. It is also the first such a large project located on the left bank of the Oder. & Nbsp;
Within three buildings in warehouses available for rent to tenants, there will be over 80,000. sq m of modern high storage space. The possibility of separating the module in already from 1 500 sq m and the location only 3 km from the center of Szczecin make it an ideal "urban" warehouse.
Construction of the first of the three warehouses is to be completed in mid-2020. p>
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
DC1 | |
---|---|
Total area sqm | 32 869 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 22,6x12m |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC2 | |
---|---|
Total area sqm | 28 533 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 22,6x12m |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |