Basic informations
Existing | 43 060.00 m2 |
Under development | 0.00 m2 |
Planned | 9 450.00 m2 |
Rent price | ASK |
Free area
Up to 1 month | 5 670.00 m2 |
Up to 3 months | 5 670.00 m2 |
Over 3 months | 5 670.00 m2 |
Min module | b.d. |
Minimum rental period | 5 years |
MLP Wrocław is a modern logistics park, which will offer over 65,000 sq m in five warehouse halls. space for rent.
Class A warehouses are equipped with a dust-free floor with a load capacity of 6T / sq m.
The net height is 10 m.
The building has fire protection and security systems.
Office and social space at the request of the Tenant & oacute; w.
The MLP Wrocław logistics park is located on a 13 ha plot.
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
DC2A | |
---|---|
Total area sqm | 9 450 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x22,5 |
Floor loading: | 6 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Hala B2 | |
---|---|
Total area sqm | 9 450 m2 |
Status: | Planned |
Stacking height: | 10.00 m |
Column grid: | 12x22,5 |
Floor loading: | 6 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Hala A1/A2 | |
---|---|
Total area sqm | 5 670 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x22,5 |
Floor loading: | 6 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Hala B1Ext | |
---|---|
Total area sqm | 5 670 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x22,5 |
Floor loading: | 6 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Hala C1 | |
---|---|
Total area sqm | 4 081 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x22,5 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Hala C2 | |
---|---|
Total area sqm | 14 400 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x22,5 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
Hala C2a | |
---|---|
Total area sqm | 3 789 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | b.d. |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
News
Producent i dystrybutor urządzeń gospodarstwa domowego wynajął około 14,6 tys. mkw. nowoczesnej powierzchni w parku logistycznym MLP Wrocław. Przekazanie gotowego obiektu firmie Electrolux planowane jest w marcu 2020 roku.
Jesteśmy bardzo zadowoleni z rozszerzenia współpracy z najemcą, który korzysta już z naszych innych powierzchni magazynowych. Centrum logistyczne MLP Wrocław jest doskonale zlokalizowane i zapewnia szybki dostęp do zachodniej części naszego kraju – powiedziała Agnieszka Góźdź, dyrektor Działu Sprzedaży w MLP Group S.A.
Rozpoczęła się budowa hali magazynowej o powierzchni około 9 500 mkw. w ramach Centrum logistycznego MLP Wrocław w Mirkowie.
Na działce o powierzchni 13 ha docelowo powstanie kompleks magazynowy o powierzchni 66 000 mkw.
Do grona Najemców MLP Wrocław dołączył europejski producent i dystrybutor suplementów diety i odżywek, wynajmując około 10 000 mkw. powierzchni magazynowej i biurowej.
Oddanie budynku do użytkowania jest przewidziane na 3Q 2018 roku.