Warehouse for rent Stocznia Centromost
01 / About the park
Logistics center Stocznia Centromost
Stocznia Centromost is an industrial, warehouse and office property, which offers over 22 & nbsp; 000 m2 of space for rent and over 16,000 modern production and warehouse space to be built on customer request (BTS).
The waterfront, which has a reinforced concrete structure with an area of 1 & nbsp; 533 m2, has a built-in crane subgrade Q -25t with rail spacing of 6m.
The square on which the building is located is equipped with production sites, access roads and paved driveways. < / p>
There is a 225.7 m long railway siding within Centromost Shipyard.
The area of 13 ha is fenced, illuminated and equipped with utilities.
& nbsp;
& nbsp;
& nbsp;
02 / Park location
Where Stocznia Centromost is located
Loading data... Open in Google Maps (new window)
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
03 / Technical specification
Buildings in the park
| Building | Total area sqm | Status: | Stacking height: | Column grid: | Floor loading: | Sprinklers |
|---|---|---|---|---|---|---|
| Hala NR I | 13 224 m2 | Planned | 13.00 m | b.d. | b.d. | No |
| Hala NR II | 6 460 m2 | Planned | 13.00 m | b.d. | b.d. | No |
| Stocznia | 22 789 m2 | Existing | 6.00 m | b.d. | b.d. | No |
04 / Find the right unit
VACANT SPACE
Availability may change. Contact the advisor to confirm the terms and the lease date.
-
Available unit
Hala NR I · warehouse space
Offices300 m².
Warehouse area12 924 m²Min module12 924 m²Stacking height13 mCheck -
Available unit
Hala NR II · warehouse space
Offices200 m².
Warehouse area6 260 m²Min module200 m²Stacking height13 mCheck -
Available unit
Stocznia · warehouse space
Offices120 m².
Warehouse area1 022 m²Min module600 m²Stacking height6 mCheck
05 / Polish Investment Zone
Tax relief calculator – Łódź SEZ
CIT / PIT exemption for a new investment at this location (municipality Płock, county m. Płock, mazowieckie) – under the regional aid map 2022–2027 and the support decision criteria.
- Max. aid – large company
- 40%
- Medium company
- 50%
- Small and micro company
- 60%
- Min. investment – large company
- 80 m PLN
- Support decision period
- 14 years
- County unemployment rate
- 5.1% (Poland 5.1%)
Nominal estimate (not discounted), not a decision. Aid is calculated on the investment costs or on the 2-year labour costs – the higher amount applies. Unemployment rates: Statistics Poland notice (as at 30.06.2025). A 15-year decision if at least 51% of the site lies in a special economic zone. Ask the advisor about the zone relief
06 / Market surroundings
Location statistics
Labour market, demographics and economy around Stocznia Centromost – municipality, county and voivodeship compared with Poland (Statistics Poland).
07 / Frequently asked
Questions about Stocznia Centromost
01
What space is available at Stocznia Centromost?
02
Where is Stocznia Centromost located?
03
Is a BTS (build-to-suit) project possible here?
04
How do I get a detailed offer for Stocznia Centromost?
08 / Ask about the offer
Find the right space for your business.
We will reply and present the available options.
Contact form
Send an enquiry
Fill in the form – an advisor will contact you with the terms.