Warehouse for rent P3 Błonie DC1
01 / About the building
Warehouse P3 Błonie DC1
P3 Blonie is a logistics center that will ultimately offer approximately 303,000 sqm of leasable warehouse space within 15 warehouse halls(of which 25,000 sqm of BTS opportunities).
The clear height of the warehouses is 8-10 m, and the floor load capacity is 5T/m2.
The sprinkler system guarantees fire protection.
Tenants have access to parking spaces and maneuvering areas.
storage halls under 24-hour security
Available module of 3582 m2.
.02 / Close to main routes
Location of P3 Błonie DC1
Loading data... Open in Google Maps (new window)
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
03 / Technical specification
Building specification
- Total area sqm
- 15 202 m2
- Status:
- Existing
- Stacking height:
- 10.00 m
- Column grid:
- 12x24
- Floor loading:
- 5 000 kg/m2
- Sprinklers
- Yes
- Cross-dock
- No
- Crane
- No
- Railway siding
- No
04 / Find the right unit
VACANT SPACE
Availability may change. Contact the advisor to confirm the terms and the lease date.
05 / Polish Investment Zone
Tax relief calculator – Łódź SEZ
CIT / PIT exemption for a new investment at this location (municipality Błonie, county warszawski zachodni, mazowieckie) – under the regional aid map 2022–2027 and the support decision criteria.
- Max. aid – large company
- 25%
- Medium company
- 35%
- Small and micro company
- 45%
- Min. investment – large company
- 100 m PLN
- Support decision period
- 12 years
- County unemployment rate
- 1.6% (Poland 5.1%)
Nominal estimate (not discounted), not a decision. Aid is calculated on the investment costs or on the 2-year labour costs – the higher amount applies. Unemployment rates: Statistics Poland notice (as at 30.06.2025). A 15-year decision if at least 51% of the site lies in a special economic zone. Ask the advisor about the zone relief
06 / Market surroundings
Location statistics
Labour market, demographics and economy around P3 Błonie DC1 – municipality, county and voivodeship compared with Poland (Statistics Poland).
07 / Market news
News
2021.11.26
Homla leases space at P3 Błonie park
„The excellent location of the P3 Błonie park near Warsaw, as well as its close proximity to roads enabling quick access to other parts of the country, makes it a popular choice not only for logistics operators but also for companies representing other industries. This is yet another agreement with representatives of the broadly defined interior design segment that we have concluded this year. According to statistics, in 2019, revenues in the home decor segment in Poland amounted to approximately 535 million dollars, and by 2024, the market value is expected to nearly double. These growth rates are many times higher than in Europe, which shows that this is a very dynamically developing market segment, further supported by the growth of e-commerce.” - explains Zbigniew Smyczyński, Senior Leasing Manager at P3 Logistic Parks in Poland.
The new facility for Homla will serve as a central warehouse, from which both deliveries to brick-and-mortar stores in shopping centers and online orders placed by individual customers will be handled. In the dedicated facility, the company will consolidate operations previously conducted in an area more than twice as small, across two other warehouses located within the park near Warsaw.
„Due to the dynamic development of our business, we decided to significantly increase our occupied space and move all operations to a single warehouse, designed and built specifically for us. We are pleased that P3 proposed solutions tailored to our current needs, while also taking into account our potential growth in the near future, providing us with the possibility of further expansion.” - says Michał Giebel, Logistics Director at Homla.
The building will have a non-standard height – 12 m clear height, a reinforced floor with a load capacity of 7.5 t, and the highest fire resistance class, which will allow for the installation of a multi-level mezzanine in the future. The facility will be built in accordance with BREEAM certification requirements at the 'very good' level. PIR core panels will be used in its construction to provide more effective insulation from external factors. Energy-efficient LED lighting with an automatic control system will be installed in the warehouse. The building will also be equipped with greywater recovery systems.
The general contractor for the facility, which is scheduled for completion in Q1 2022, is Kajima Poland.
The P3 Błonie park is located just 27 km west of Warsaw, at the intersection of national road no. 92 and the A2 motorway (which is part of the E30 European transit route). The park consists of 14 buildings, which, in addition to typical warehouse space, also include cold stores, freezers, and a data center.
2021.11.18
Antalis stays longer at P3 Błonie
Developer P3 has extended a warehouse lease agreement with Antalis at the P3 Błonie park. This is another tenant, following Katcon and Edu-Książka, that has decided to continue its warehouse lease in this park in recent months. Antalis is a distributor of paper, packaging, and visual communication solutions in Europe. The company has 103 distribution centers.
The facility at the P3 Błonie park was designed according to the tenant's requirements and built in 2017. The building incorporates ecological solutions in the form of insulation panels, solar panels for domestic hot water heating, as well as LED lighting. P3 also provides the company with an external office.
"The Błonie municipality has for years been one of the most popular locations on the Polish warehouse space market, often referred to as the capital of Polish logistics. Facilities at the P3 Błonie park enjoy very high interest from both Polish and foreign companies. The very good location near Warsaw, close to the motorway and national roads, ensures efficient product distribution as well as access to qualified employees. We are pleased that after several years of cooperation, we continue to meet the requirements of our partners, and our warehouses consistently provide operational efficiency, functionality, as well as savings in terms of resource utilization." - comments Zbigniew Smyczyński, Senior Leasing Manager at P3 Logistic Parks in Poland.
P3 Błonie Park is located 27 km west of Warsaw, at the intersection of national road no. 92 and the A2 motorway. The park consists of 14 buildings, which, in addition to typical warehouse space, also include cold stores, freezers, and a data center.
08 / Ask about the offer
Find the right space for your business.
We will reply and present the available options.
Contact form
Send an enquiry
Fill in the form – an advisor will contact you with the terms.