Krak Logistics Center & oacute; w- Kokot & oacute; in this is a logistics center, which within eight buildings will ultimately offer 180 & nbsp; 000 m2 of modern logistics and warehouse space.
The whole center is based on an innovative system for automatic identification of goods & oacute; using the STAR system of the American company Mojix Inc.
Modern surfaces meet the expectations of the most demanding customers. . & nbsp; p>
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
DC1 | |
---|---|
Total area sqm | 13 280 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC2 | |
---|---|
Total area sqm | 13 880 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x22,5 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC3 | |
---|---|
Total area sqm | 5 778 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC4 | |
---|---|
Total area sqm | 26 150 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC5 | |
---|---|
Total area sqm | 20 665 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC6 | |
---|---|
Total area sqm | 26 181 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC7A | |
---|---|
Total area sqm | 10 295 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | b.d. |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC7B | |
---|---|
Total area sqm | 22 301 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC8 | |
---|---|
Total area sqm | 41 480 m2 |
Status: | Existing |
Stacking height: | 13.00 m |
Column grid: | 12x24 |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
News
Powstająca hala magazynowa w Centrum logistycznym 7R Park Kraków zyskała nowego Najemcę.
Firma Igepa Polska, która jest dystrybutorem papierów poligraficznych, biurowych i materiałów do reklamy wizualnej, zadecydowała się na wynajęcie 2 000 mkw. na terenie inwestycji.
W związku z tym, budynek numer 4 w 7R Park Kraków został w całości wynajęty przed oddaniem do użytku.
DSV, który jest globalnym dostawcą usług logistycznych i transportowych, zmienił lokalizację magazynu i biura na 7R Logistic Park Kokotów.
Nowa lokalizacja zajmuje około 1 500 mkw. powierzchni magazynowej i 250 mkw. biura.
Operacje magazynowe i przeładunkowe są prowadzone na 6 rampach i jednej rampie zero.
Decyzja o zmianie lokalizacji była podyktowana dynamicznym rozwojem firmy.