Basic informations
| Existing | 71 838.00 m2 |
| Under development | 0.00 m2 |
| Planned | 0.00 m2 |
| Rent price | ASK |
Free area
| Up to 1 month | 20 213.00 m2 |
| Up to 3 months | 20 213.00 m2 |
| Over 3 months | 20 213.00 m2 |
| Min module | 2 000.00 m2 |
| Minimum rental period | 5 years |
7R Park Kielce is a modern investment which will eventually offer about 62,000 sq m. warehouse and office space for rent.
Warehouses with a height of 10m, give the possibility of high storage, it is also possible to adapt the space for light production. & nbsp;
A dust-free floor with a load capacity of 5T / sq m.
Mesh column & oacute; in 12x24.
Adaptation of warehouse and office space to the individual requirements of tenants. >
Minimal warehouse modules in 7R Park Kielce available from around 2,000 sq m
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| Warehouse area | Min module | Check availability |
|---|---|---|
| 16 293 m2 | 3 000 m2 | CHECK |
| 3 920 m2 | 3 920 m2 | CHECK |
| DC1A | |
|---|---|
| Total area sqm | 24 907 m2 |
| Status: | Existing |
| Stacking height: | 11.70 m |
| Column grid: | 12x24 |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |
| DC1B | |
|---|---|
| Total area sqm | 15 783 m2 |
| Status: | Existing |
| Stacking height: | 11.70 m |
| Column grid: | 12x22,5 |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |
| DC2B | |
|---|---|
| Total area sqm | 31 148 m2 |
| Status: | Existing |
| Stacking height: | 11.70 m |
| Column grid: | 12x22,5 |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |
News
W podkieleckiej gminie Chęciny powstaną hale o powierzchni 74 000 mkw., które są dedykowane klientom z różnych branż. Całkowity koszt inwestycji to ponad 150 milionów złotych. Realizacja budowy ma rozpocząć się w tym roku, a pierwsza część obiektu o powierzchni 24 500 mkw. ma być oddana do użytku w 2Q2019 roku.