Basic informations
Existing | 65 807.00 m2 |
Under development | 0.00 m2 |
Planned | 24 570.00 m2 |
Rent price | ASK |
Free area
Up to 1 month | 5 400.00 m2 |
Up to 3 months | 5 400.00 m2 |
Over 3 months | 5 400.00 m2 |
Min module | 1 500.00 m2 |
Minimum rental period | 3 years |
Waimea Logistic Park Bydgoszcz is a modern logistics center, which will ultimately offer approximately 90,000 sq m within six warehouse halls. space for rent.
The height of the building is 10m, which allows storage.
Dust-free floor.
The developer allows tenants to adapt the space for light production. < / p>
The logistics center was created for small and medium-sized companies.
Minimal warehouse modules available from approximately 650 sq m. P>
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
Warehouse area | Min module | Check availability |
---|---|---|
18 000 m2 | 3 000 m2 | CHECK |
5 400 m2 | 2 700 m2 | CHECK |
DC1 | |
---|---|
Total area sqm | 9 070 m2 |
Status: | Existing |
Stacking height: | 12.00 m |
Column grid: | 12x22,5 |
Floor loading: | 70 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC2 | |
---|---|
Total area sqm | 16 200 m2 |
Status: | Existing |
Stacking height: | 12.00 m |
Column grid: | 22,5x12m |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC3 | |
---|---|
Total area sqm | 24 570 m2 |
Status: | Planned |
Stacking height: | 12.00 m |
Column grid: | 12x22,5 |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC4 | |
---|---|
Total area sqm | 17 550 m2 |
Status: | Existing |
Stacking height: | 12.00 m |
Column grid: | 12x22,5 |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC5 | |
---|---|
Total area sqm | 18 052 m2 |
Status: | Existing |
Stacking height: | 10.00 m |
Column grid: | b.d. |
Floor loading: | 5 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
DC6 | |
---|---|
Total area sqm | 4 935 m2 |
Status: | Existing |
Stacking height: | 12.00 m |
Column grid: | 12x22,5 |
Floor loading: | 7 000 kg/m2 |
Sprinklers | |
Cross-dock | |
Crane | |
Railway siding |
News
Jeden z największych europejskich producentów artykułów gospodarstwa domowego z tworzyw sztucznych, firma keeeper wprowadzi się do powstającej hali D, którą wynajął w całości. Obiekt liczy sobie około 17 800 mkw. i będzie oddany od użytku w połowie 2020 roku.
Waimea Logistic Park Bydgoszcz ma ciekawą miejską lokalizację, która jest istotnym atutem pod kątem rekrutacji przyszłych pracowników obiektu przez najemców. Przystanek komunikacji publicznej usytuowany jest zaledwie ok. 100 m od parku, a stacja kolejowa ok. 4 km. Jestem przekonany, że jakość projektu, lokalizacja w połączeniu z modelem współpracy z najemcami zakładającym indywidualne podejście i dużą elastyczność w ustalaniu zmian projektowych, są naszą mocną stroną w procesie komercjalizacji – powiedział szef projektu w Waimea Holding, Wojciech Woliński.
Do Najemców Parku logistycznego Waimea Logistic Park Bydgoszcz dołączyła firma BKT Elektronik, która jest producentem i dostawcą rozwiązań na rzecz branży teleinformatycznej.
Firma zajmie około 1 850 mkw. powierzchni magazynowo-biurowej.