Warehouse for rent Panattoni Park Gliwice III

Śląskie, Gliwice, ul. Bojkowska

Updated:

01 / About the park

Logistics center Panattoni Park Gliwice III

02 / Park location

Where Panattoni Park Gliwice III is located

Śląskie, Gliwice, ul. Bojkowska
Map type
Travel mode
Travel time

An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.

Distance

Autostrada A1
3 km
Autostrada A4
3 km
Droga krajowa 44
3 km

Check the route

Driving route from Panattoni Park Gliwice III to a chosen place.

Open the map (new window)

03 / Easy commute

Public transport

Map and list of nearby stops and stations. Distances are measured from the logistics park.

Loading data...

04 / Technical specification

Buildings in the park

Buildings – Panattoni Park Gliwice III
Building Total area sqm Status: Stacking height: Column grid: Floor loading: Sprinklers
DC1 47 000 m2 Existing 10.00 m 12x22,5 5 000 kg/m2 Yes
DC2 27 500 m2 Existing 10.00 m 12x22,5 5 000 kg/m2 Yes
DC3 60 000 m2 Existing 10.00 m 12x22,5 5 000 kg/m2 Yes
DC4 34 000 m2 Existing 10.00 m 12x22,5 5 000 kg/m2 Yes
DC5 11 070 m2 Existing 10.00 m 12x22,5 5 000 kg/m2 Yes

05 / Find the right unit

VACANT SPACE

Availability may change. Contact the advisor to confirm the terms and the lease date.

  • No available units

    No units are available at the moment

    Leave your details – we will let you know when space becomes available in Panattoni Park Gliwice III.

    Notify me of availability

06 / Polish Investment Zone

Tax relief calculator – Katowice SEZ

CIT / PIT exemption for a new investment at this location (municipality Gliwice, county m. Gliwice, śląskie) – under the regional aid map 2022–2027 and the support decision criteria.

Max. aid – large company
40%
Medium company
50%
Small and micro company
60%
Min. investment – large company
100 m PLN
Support decision period
14 years
County unemployment rate
2.5% (Poland 5.1%)

Nominal estimate (not discounted), not a decision. Aid is calculated on the investment costs or on the 2-year labour costs – the higher amount applies. Unemployment rates: Statistics Poland notice (as at 30.06.2025). A 15-year decision if at least 51% of the site lies in a special economic zone. Ask the advisor about the zone relief

07 / Market surroundings

Location statistics

Labour market, demographics and economy around Panattoni Park Gliwice III – municipality, county and voivodeship compared with Poland (Statistics Poland).

08 / Frequently asked

Questions about Panattoni Park Gliwice III

01

What is the available warehouse space at Panattoni Park Gliwice III?

Panattoni Park Gliwice III (Gliwice, Silesian Voivodeship) offers 179 570 m² of warehouse space in 5 class A buildings. Currently, the entire area is leased — information about upcoming availability is provided by the property manager from MAXON Nieruchomości.
02

What is the rent at Panattoni Park Gliwice III?

The rent at Panattoni Park Gliwice III is determined individually with the tenant — it depends on the square footage, contract duration, and the scope of fit-out works. For a detailed quote, please contact MAXON Nieruchomości.
03

Is Panattoni Park Gliwice III available immediately?

Currently, Panattoni Park Gliwice III is fully leased — none of the units are available immediately. The status of the offer was confirmed on 2026-11-02. To check for upcoming opportunities, please contact the property manager from MAXON Nieruchomości.
04

What are the technical parameters of the hall at Panattoni Park Gliwice III?

Panattoni Park Gliwice III offers a clear height of 10 m, a column grid of 12×22.5, and a dust-free floor with a load-bearing capacity of 5000 kN/m². The facility features loading docks, sprinklers, smoke vents, and lighting. Gas heating is also provided.
05

How far is Panattoni Park Gliwice III from the A1 motorway?

Panattoni Park Gliwice III (Gliwice) is located 3 km from the A1 motorway and 3 km from the A4 motorway. Additionally, national road No. 44 runs 3 km away, providing excellent transport access for logistics.
06

What operations is Panattoni Park Gliwice III suitable for?

Panattoni Park Gliwice III is a class A facility that is perfect for warehousing, logistics, and distribution. Thanks to its appropriate parameters and infrastructure, the facility also allows for light manufacturing.
07

Is Panattoni Park Gliwice III for rent or for sale?

Panattoni Park Gliwice III offers warehouse and office space exclusively for rent. Detailed lease terms and space adaptation possibilities are determined individually by the property manager from MAXON Nieruchomości.
08

What infrastructure and ESG amenities does Panattoni Park Gliwice III have?

Panattoni Park Gliwice III offers spacious maneuvering yards, a truck parking area, a fenced site, and 24/7 security and CCTV monitoring. The facility does not have overhead cranes or a railway siding.
09

Who is the developer of Panattoni Park Gliwice III?

The developer of the Panattoni Park Gliwice III complex is Panattoni. The investment includes 5 existing buildings with a total area of 179 570 m².
10

Which units in Panattoni Park Gliwice III are currently available?

At Panattoni Park Gliwice III, all units are currently leased — the total area of 179 570 m² in 5 buildings is in use. Current availability and any upcoming vacancies are confirmed by the property manager upon request.
11

When was the Panattoni Park Gliwice III offer last updated?

The Panattoni Park Gliwice III offer was last updated on 2026-11-02. Current space availability and updated lease terms are confirmed by the property manager from MAXON Nieruchomości upon request.
12

What space is available at Panattoni Park Gliwice III?

The total warehouse space of Panattoni Park Gliwice III is approx. 179 570 m². Current availability of free units is confirmed by the broker in charge.
13

Where is Panattoni Park Gliwice III located?

Panattoni Park Gliwice III is located in Gliwice (śląskie voivodeship). Distances to motorway junctions and airports are listed in the “Location” section.
14

Is a BTS (build-to-suit) project possible here?

If the developer of Panattoni Park Gliwice III has free plots, a build-to-suit project tailored to the tenant is possible. A BTS usually starts at 10,000 m² and takes 12–18 months from signing.
15

How do I get a detailed offer for Panattoni Park Gliwice III?

Fill in the contact form or call the broker in charge of Panattoni Park Gliwice III. Within 24–48 hours you will receive the technical sheet, the current rent and unit availability. Tenant advisory is free of charge.

09 / Ask about the offer

Find the right space for your business.

If you are interested in renting space in the Panattoni Park Gliwice III warehouse building, please fill in the short form below. The agent in charge of that building will contact you as soon as possible and provide you with specific rental conditions and informations about similar buildings.

We will reply and present the available options.

Call the advisor Dariusz Sroka
Show number

Contact form

Send an enquiry

Fill in the form – an advisor will contact you with the terms.

Consents

Fields marked * are required.

This form is protected by reCAPTCHA – the Google Privacy Policy and Terms of Service apply.

WeChat

您有任何問題嗎?請寫信給我們

如果您有任何問題或想瞭解更多可能的優惠,您可以隨時寫信給我們。我們會儘快回覆。

WeChat QR