Panattoni Park Gliwice IV is a modern class A logistics center, which is being built with the most demanding market operators in mind. This prestigious investment will provide a total of several dozen thousand square meters of top-quality business space. The complex consists of two independent halls. The DC1 building, currently under construction, has already found its target tenants. In turn, the planned DC2 hall will offer extensive warehouse space for rent, amounting to over 53 thousand square meters. This project is an excellent proposal for companies looking for flexible space for distribution, production, or e-commerce operations in the heart of one of the main economic hubs in the country.
The presented class A warehouses have been designed in accordance with the rigorous requirements of sustainable construction. The complex can boast a prestigious BREEAM certificate at the Excellent level. This means the implementation of solutions that minimize the carbon footprint, reduce utility consumption, and ensure a friendly and healthy work environment for the employed personnel. The external infrastructure of the facility includes a secure fenced area, spacious maneuvering yards, and extensive parking lots for trucks, which are monitored by 24/7 security and a CCTV camera system.
Upper Silesia has for years maintained its position as the absolute leader on the industrial map of Poland. By choosing this distribution center, investors gain access to an extremely absorbent sales market and a powerful base of qualified workers. Gliwice, with its strong engineering tradition and proximity to the Silesian University of Technology, attracts key players from the automotive, technology, and e-commerce sectors. The presence of the Katowice Special Economic Zone further stimulates the development of local business, making this region an ideal place to locate operations of pan-European importance. Each warehouse hall included in the park has been designed to maximize the logistics potential of this bustling agglomeration.
A key argument in favor of choosing Panattoni Park Gliwice IV is the unrivaled availability of road infrastructure. The facility is located just 1 km from the A4 motorway junction, which is the main transit artery of southern Poland, connecting the western border with the east of the country. Access to the center of Gliwice takes a short moment, as it is 8 km away from the park, while the heart of the agglomeration – Katowice – is 30 km away. From the point of view of foreign logistics, a huge convenience is the proximity of the border with the Czech Republic, which can be reached by covering 42 km. Furthermore, companies relying on cargo transport will appreciate the efficient access to the Katowice-Pyrzowice International Airport, located 54 km away. Such geographical conditions guarantee the rapid execution of supply chains to domestic and Central European markets.
Distance:
Check distance
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| Total area sqm | Status: | Stacking height: | Column grid: | Floor loading: | Sprinklers | |
|---|---|---|---|---|---|---|
| DC1 | 12 000 m2 | Under construction | 12.00 m | 12x22,5 | 5 000 kg/m2 | |
| DC2 | 53 456 m2 | Planned | 12.00 m | 12x22,5 | 5 000 kg/m2 |
| Warehouse area | Min module | Check availability | |
|---|---|---|---|
| DC2 | 53 456 m2 | 4 000 m2 | ASK |