A modern logistics center located in Teresin at the 92 national road.
Total planned warehouse, production, office and social space around 49 & nbsp; 000 m 2 & nbsp; in 2 halls.
Investment duration: approx. 10 months
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| DC1 | |
|---|---|
| Total area sqm | 26 304 m2 |
| Status: | Planned |
| Stacking height: | 10.00 m |
| Column grid: | 22,5x12 |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |
| DC2 | |
|---|---|
| Total area sqm | 25 920 m2 |
| Status: | Planned |
| Stacking height: | 10.00 m |
| Column grid: | 22,5x12 |
| Floor loading: | 5 000 kg/m2 |
| Sprinklers | |
| Cross-dock | |
| Crane | |
| Railway siding | |