Waimea Logistic Park Teresin is a warehouse, logistics, and production center with a total planned building area of approx. 49,000 m2.
The Waimea Logistic Park Teresin complex will include 2 modern class A halls designed in accordance with the requirements of modern warehouse and logistics management, which can be adapted to the needs of distribution and production companies. Each of the halls will be equipped with loading docks and "zero" level entrance gates.
The warehouses for rent available to tenants within the park will be built in accordance with the standard that tenants can expect from a modern A-class facility:
Investment completion time: approx. 10 months
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| Total area sqm | Status: | Stacking height: | Column grid: | Floor loading: | Sprinklers | |
|---|---|---|---|---|---|---|
| DC1 | 26 304 m2 | Planned | 10.00 m | 22,5x12 | 5 000 kg/m2 | |
| DC2 | 25 920 m2 | Planned | 10.00 m | 22,5x12 | 5 000 kg/m2 |