Warehouse for rent BW5000
01 / About the building
Warehouse BW5000
Warehouse and production facility with an area 5000 sq m and an office with an area 300 sq m located directly on the E30 route and at the exit of the planned A2 motorway (completed by 2022). The 77m x 65m building can be divided into 830 sq m segments and used for storage and light production. In front of the building there is a large 12,000 sq m maneuvering yard paved with parking lots, illuminated, fenced, monitored and secured with motion sensors.
Natural hall lighting with 18 light bands with ventilation flaps, which gives 11% of the roof area. Heating with gas heaters to be performed according to the tenant's needs. Non-dusting, hardened industrial floor with a load capacity of 6t / m2, smoke and temperature detectors (SSP system) with a central office building. Own 630 kW trafo station, 200 kW left to use.
7 dock & oacute; w, three gates from level "0".
& nbsp;
& nbsp ;02 / Close to main routes
Location of BW5000
Loading data... Open in Google Maps (new window)
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
03 / Technical specification
Building specification
- Total area sqm
- 5 300 m2
- Status:
- Existing
- Stacking height:
- 10.00 m
- Column grid:
- 1
- Floor loading:
- 6 000 kg/m2
- Sprinklers
- No
- Cross-dock
- No
- Crane
- No
- Railway siding
- No
04 / Find the right unit
VACANT SPACE
Availability may change. Contact the advisor to confirm the terms and the lease date.
-
No available unitsNotify me of availability
No units are available at the moment
Leave your details – we will let you know when space becomes available in BW5000.
05 / Polish Investment Zone
Tax relief calculator – Tarnobrzeg SEZ EURO-PARK WISŁOSAN
CIT / PIT exemption for a new investment at this location (municipality Siedlce, county siedlecki, mazowieckie) – under the regional aid map 2022–2027 and the support decision criteria.
- Max. aid – large company
- 50%
- Medium company
- 60%
- Small and micro company
- 70%
- Min. investment – large company
- 80 m PLN
- Support decision period
- 15 years
- County unemployment rate
- 5.1% (Poland 5.1%)
Nominal estimate (not discounted), not a decision. Aid is calculated on the investment costs or on the 2-year labour costs – the higher amount applies. Unemployment rates: Statistics Poland notice (as at 30.06.2025). A 15-year decision if at least 51% of the site lies in a special economic zone. Ask the advisor about the zone relief
06 / Market surroundings
Location statistics
Labour market, demographics and economy around BW5000 – municipality, county and voivodeship compared with Poland (Statistics Poland).
07 / Ask about the offer
Find the right space for your business.
We will reply and present the available options.
Contact form
Send an enquiry
Fill in the form – an advisor will contact you with the terms.