A BTS facility with a total area of 10 800 sq m was developed by Panattoni Europe for the company Syncreon. The modern warehouse and production hall is appropriately adapted to the tenant's needs and provides optimal conditions for repairing electronic equipment and refilling printer cartridges.
The facility allows for high-bay storage with a clear height of 10m and is equipped with a dust-free floor with increased load-bearing capacity, energy-efficient LED lighting, and roof skylights ensuring an adequate level of natural light in the hall. The outdoor area of the investment features a spacious parking lot for passenger cars and trucks, as well as maneuvering yards.
The Lubuskie Voivodeship is one of the fastest-growing warehouse locations in Poland. The region's primary advantage is its strategic geographical location, which opens up a range of opportunities for distribution on a national and international scale, particularly to Germany. The region has a developed transport infrastructure, which includes the A1 and A2 motorways, the S3 expressway, railway routes, and access to an airport.
BTS Synceron is located in the town of Żary on Gospodarcza Street.
Check distance
An isochrone is marked on the map, showing the range / commute time at a certain time. You can change your commute time and choose a different means of transportation to see new ranges. To check the range and route of your commute, use the search engine below.
| Total area sqm | Status: | Stacking height: | Column grid: | Floor loading: | Sprinklers | |
|---|---|---|---|---|---|---|
| DC1 | 10 800 m2 | Existing | b.d. | b.d. | b.d. | |
| DC2 | 8 985 m2 | Existing | 10.00 m | b.d. | 5 000 kg/m2 |